jytan 发表于 2007-11-28 15:14

在求二次规划的时候遇到的错误提示

Warning: Large-scale method does not currently solve this problem formulation,
using medium-scale method instead.
> In quadprog at 264
In main_svcpath at 57
Maximum number of iterations exceeded; increase options.MaxIter.
To continue solving the problem with the current solution as the
starting point, set x0 = x before calling quadprog.

请问这是啥意思?
下一步怎么做呢?

eight 发表于 2007-11-28 15:16

原帖由 jytan 于 2007-11-28 15:14 发表 http://www.chinavib.com/forum/images/common/back.gif
Warning: Large-scale method does not currently solve this problem formulation,
using medium-scale method instead.
> In quadprog at 264
In main_svcpath at 57
Maximum number of iterations exc ...
如果看不懂英文,用金山词霸吧,没有什么难度

jytan 发表于 2007-11-28 18:43

英文我都看懂了,还是不太理解。。

jytan 发表于 2007-11-28 18:44

就是不太明白错误在哪。。该怎么改进。

eight 发表于 2007-11-28 18:48

help quadprog
页: [1]
查看完整版本: 在求二次规划的时候遇到的错误提示